Out Of Hibernation

Well, I decided to move this project out of Hibernation and into FO status. These were intended to be my Knee High Christmas socks. But in the end I just couldn’t get past how much brain space and purling it would take to make my original vision. So I wasn’t even picking this project up…..at all.

So I am just going to finish them as they are. I have already added a very small cuff to each sock and I finished the toe decreases on the second tube. This was a Lolodidit Hippo for Christmas skein I had cranked into a sock snake/sock tube.

Basically at this point all I have left to do is add heels and then these can move into my sock drawer. They will be pretty tall but won’t be knee highs. I do have some concern that they won’t fit my full calves but if that happens these can just be socks for my sister. Win win.

It feel liberating to finally make a decision on this project and get it out of my WIP box. Happy Knitting!!

1 thought on “Out Of Hibernation

  1. Pingback: FO Friday: Knee High Christmas Socks | My Tangled Yarn Knitting Adventures

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s