Closing Out The Rainbow

I ran out of gas yesterday and didn’t feel like posting my hat. On the plus side, the all day meeting generated three new stripes on my Radiate Hat!

It is going to be patently clear that I will need another scrap yarn to finish this out. I am in the blues and have two more blues left after this. And that won’t be enough to get to the length I need for a Musselburgh like hat. I need to search my Ravelry stash to see what I have. Would prefer that instead of buying new yarn.

Happy Knitting!!

One Finished Radiate Sleeve

I have been slacking on this project and it has been sitting on my WIP pile. But I did finally finish the first sleeves on my Rainbow Radiate sweater.

I don’t have super long arms but I like a good sleeve so this took almost an entire skein. And I have a new full skein attached so I can start sleeve #2. This confirms to me that I will need to use my Wichita Woolery similar skeins and alternate with my 316 dye studio skeins to finish the body. Not the best outcome but I can use helical knitting to reduce the differences. This sweater is so speckled that I don’t think it will show in the end.

Happy Knitting!!

Knitting In The Dark

Day two this week of marathon meetings. It’s after 9 pm and I am just going home. But on the plus side, I have added 2.5 color stripes to my Radiate Hat.

My hands honestly started to hurt after a 4 hour meeting. But I am really happy with how the rainbow is developing. Just like the sweater I questioned my choices until I got enough colors added to see the vision.

I unfortunately have another FULL DAY meeting tomorrow. Let’s see how much progress I can make there 🙂

Happy Knitting!!

Hats In Meetings

This is my week of meetings. So I am documenting how much hat can be made while waiting and listening.

I am on my second shade of pink in my Radiate Hat. I got a few funny looks from the public sitting next to me in this work meeting. But I smiled and knit on. I didn’t get much added to this project when playing Mom Taxi so I am switching up this project’s designated location.

Do you have different projects for different locations?

Mom Taxi Knitting

So the conference knitting was a bit a failure. I managed one purple stripe and started a pink stripe.

So I have pulled this out to work on while being a mom-taxi during this crazy month. I think we have 3 birthdays, 7 school events and 1,000 practices. I am interested to see how the yarn knits up on this as I don’t have equal remaining amount of the colors. Some colors have more as they occurred sooner in the yoke of my sweater than others.

I do like this round and round knitting with a good audio book or podcast to survive the long mom hours. What is your go-to for waiting?

Happy Knitting!!

Almost A Sleeve

Slowly but surely, I am making a Rainbow Radiate sleeve.

I have been slipping my arm through the neck opening and putting the sleeve on my arm to try it on as I go. I am placing the decreases where I need them for my anatomy and NOT where the pattern states. I think I added 6 or 7 total decreases?

This is a superwash yarn so I am cautious to stop a little before I think I need to in order to accommodate blocking growth. I am super close and should start the ribbing soon! And then of course….do a second sleeve.

Happy Knitting!!!

Conference Knitting

I pushed through and got my Radiate Hat to the point I am working on circulars. No more DPNs!!

It looks mostly like a coaster at this point than a hat, lol. I am working from the darkest purples and back to through the rainbow to the blues. Just the same as the order I used in my Rainbow Radiate sweater.

This is what my hat looks like before an 8 hour hitch at a conference. Let’s see what progress I can make!

Happy Knitting!!

Divide Those Sleeves!

After some fiddling and a few dropped stitches, I have my Rainbow Radiate ready for sleeves!

I finished the short row shaping, put sleeves on waste yarn and worked about 6/7 rows of the body. I have decided I like working the sleeves first before the weight of the full body of the sweater exists. It’s less fabric to have in my lap and “turn” as I work sleeves.

I grabbed some shorty circulars and put the first sleeves on and going. This has a second silver lining….I can maximize the yarn used in the body without having to save any for the sleeves. I have two kinds of grey main color that I am blending so I need to be careful.

These will be full length sleeves so I have some way to go to get these done but those short round and round circles are mostly satisfying. Lots of progress develops quickly! Happy Knitting!!

Volcan Body

Professional development is turning out to be great for my knitting productivity. My Volcan Hat has a completed body!

I probably could have finished this hat during my all day training except for I didn’t bring my DPNs to work the decreases. One good evening of TV and actually locating my DPNs should get this hat all the way done!

A couple of coworkers have complimented this hat. So I am thinking about a potential recipient. It’s almost May here so hats are NOT necessary anymore. I think I have some time to decide 🙂

Happy Knitting!!

Peaks Of Pinks

We are back to golf lessons and patio time for mom. Which is great as my Rainbow Radiate has reached my first pink color!

I am glad I went back and corrected the stiches that were bothering me. The rows are long now that I have fully increased for my bust but the rainbow is worth it. I have three more colors to add after this hot pink. So I am CLOSE.

Of course after this it is miles and miles of stockinette body in the main color of the speckled grey. I should be careful what I wish for! Happy Knitting!!