Rosewood Progress

My Rosewood Sockhead slouch is about the only knitted item I have been able to make progress on lately. It’s my bedside, in the dark, listening to podcasts and trying not to wake up the baby knitting. It really is knitting up nicely!

I’m at roughly 8 inches of hat and based on my Rainbow Pop sockhead hat I need to get to 11 inches before I start the decreases.

Happy Knitting!!

(Re)Cast On: Rainbow Pop Sockhead Slouch

I had previously regaled you with the tale of many cast-ons and frogging of a Sockhead Slouch. I think I had “swatched” enough to be satisfied with a gauge and stitch count for the project and then I realized that the 2018 Pigskin Party KAL was starting September 6th. So I frogged what I had and waited to cast on my final iteration of the hat until it counted for the KAL. And then I knit like the wind!

img_5484

I’ve cruised through four inches of 1×1 rib and I’m into the stockinette section. I’m pretty pleased with how the color is dispersing. It’s almost a tad bit striped but it is definitely not pooling or flashing so I’m happy.

This project has been promoted to primary purse and bedside table knitting. Just soothing round and round and round knit stitches with no brain space required. I could go for a good movie so I could make some serious progress on this puppy!

I have one niggling thought….do I knit a slightly less slouchy hat and save yarn for some matching fingerless mitts??

Happy Knitting!!

 

Body Work Done

PB’s second Sporty Cardigan is complete down through the body and bottom ribbed band.

I think the stripes turned out very nicely. I carried the yarn up one side of the sweater so I didn’t have that many ends left hanging out. And I’m happy but not over confident with the amount of yarn I have left over. We will have to see how the button bands go….

Happy Knitting!!

Gauge Is A Thing

PB’s Gidday Baby sweater has one sleeve. But my sleep deprived noticed one small problem.

Guess what…..gauge is a thing….

I just grabbed the DPNs at the bottom of my project bag and merrily knit away. Well, they are one size smaller than the needles I used for the body. And boy howdy can you tell they are different gauges. I quickly made the executive decision that I don’t get enough knitting time to rip them out and redo them. I’m just going to call this an “unintentional design feature” and move on the second sleeve.

On the upside….I did manage to minimize the laddering between my DPNs, lol. Happy Knitting!!

WIP Wednesday: Big Bang Socks

I finished the first tube of the Big Bang Vanilla Socks!

This is a LONG tube and I still had yarn left. I safely tucked the cake away into the tube lest sticky Jellybean fingers latch onto it. For a minute I considered knitting them until I ran out of  yarn…but ain’t nobody in this house have the time to figure out calf shaping. Especially with my 20+ years of volleyball muscled calves. Maybe I’ll have enough yarn to make tube socks for PB?

In order to keep my bedside/in the dark knitting going I quickly cast on the toe of the second sock and re-stashed in my nightstand. I feel this project losing a bit of steam as I’ve been obsessed with PB’s Sporty Cardigan. But hey….what else are nice plain vanilla socks for anyway? Always there and ready to be picked up with no pattern to fuss about!

Happy Knitting!!

An Almost Cardigan

Well the weekend proved fruitful…sort of. PB received her 2 month vaccinations and required extra snuggles and a TON of nursing to get over the hump. But lots of snuggling meant some easy knitting on PB’s Sporty Cardigan over top of a sleeping baby.

I managed to finish the body, knit on the button bands and *almost* finish the first sleeve. I did have to take Jellybean to the craft store to track down some size 6 metal dpns. I had to settle for Micheals brand store needles. But they worked just fine. I was using my Knit Picks nickle plated interchangeables for the body anyway and I like to use the same needle material when possible to keep gauge consistent.

I’m really hoping to bang out both sleeves this week….fingers crossed! Happy Knitting!!

Sporty Cardigan Update

I may have an addiction. My Sporty Cardigan for PB is cruising right along.

I managed to work through the raglan increases, separate for the sleeves and work a good chunk of the body! It’s been a quick minute since I had to do so many purl back rows. So much of my last few projects have been garter or in the round that I haven’t had much occasion to do many purl rows!

I’m really hoping against all hopes that I can get this done before I go back to work or before she out grows it….which ever comes first, lol!

Happy Knitting!!

WIP Wednesday: Thotful Spot Hat

The knitting and napping method worked so swell the other day that I tried it again on my Thotful Spot hat!

I’m past the brim and well into the stockinette section. I just need to hit the magic number of 7 inches of work and I can start decreasing for the crown! This project has moved into the “bedside table” slot now that it’s stockinette in the round (in addition to nap-time knitting). But will have to be demoted after I get to the decreases. Double pointed needles plus counting stitches for decreases do not mix with almost complete darkness.

Happy Knitting!!

Thotful Progress

One bright side about PB deciding to come early….I got to attend my family’s annual reunion in my hometown. Mind you, this is an event I organize annually and had accepted that I would just miss it this year. But it all worked out and we had a lovely weekend and not a horrible first long car trip with two kids.

I squished myself in the middle row between my two children’s car seats to manage diaper changes, pacifiers, snacks and entertainment. (It wasn’t terribly comfortable but I survived). The kids did REALLY well on both the to and from trips so I squeezed in some knitting in the car and at the reunion while other people were holding/playing with my children. This is my hospital cast on of the Thotful Spot hat by Sarah Schira.

I finished the 2.5 inches of ribbing and put at least a couple inches of stockinette on the hat itself. The yarn is from Potion Yarns in their Temptress base in the Walk on the Left Side color. The blips of color are just mesmerizing to watch develop. Since this is stockinette and I’m back home, this has become my bedside/in the dark knitting. So I’m hoping it grows little by little when I can sneak a few minutes here and there.

Happy Knitting!!

A Tale of Two Socks

My (accidental) travel socks have been giving me the call of the siren lately. They have been living in my work backpack and I have been pulling them out during my lunch breaks and car riding blocks of time. My work load at my job is totally whack-a-doodle and I have found the need for knitting comfort a lot lately. (Whack-a-doodle being an official accounting term, lol)

I have firmly decided to add contrasting toes and heels in some solid grey that matches nicely. And I am working both socks at the same time. I work a little on one and then some on the other as I feel to keep them roughly the same size. The yarn balls are the same amount by the way, one is center pull and the other pulling from the outside so the stripes match up. Therefore the yarn balls are more/less compact giving the illusion of two different amounts. I’m just going to knit peaceful stockinette until they are long enough or I run out of yarn, whichever comes first.

They only caveat to this plan would be to use the ball (left) that has an un-used center pull portion to add a square to my mitered square blanket before I use up all the yarn. I have been feeling the call of that project as well and I think this cheery skein would be a great addition.

Happy Knitting!!