WIP Wednesday: Leftover Blackberry Socks

After two days of all day training I have made some progress on my Leftover Blackberry sock. I’ve turned the heel and started the leg!

  
I know, I was going to work on my Training Socks but they were just too bulky to tuck into my special yarn pocket. What, you’ve never seen a special yarn pocket?

  
Okay maybe it wasn’t designed for knitting but it’s a small discreet way to hold my yarn and sock without being obvious. And believe me knitting was necessary to stay awake during hours and hours of lecture style “class”.

And we are back at it today….yay?! Maybe I can have finished socks by the weekend?

Happy Knitting!

Training Socks

As a reward for getting my Checkerboard Socks off the needles I pulled yarn from the stash for the next pair. I’m going to be in training and conferences for work on and off for most of August and into September so I need a pair of traveling vanillas.

I pulled the Saki Bamboo (light fingering) from my stash in a nuetral grey with short rainbow striping. I got this as a Mother’s Day yarn splurge back in May. I’ve been dying to knit with this. I’m thinking I’m going to model these after my Maple Vanilla socks and do a 74 or 76 stitch sock on US 0s. Again to ward off mommy brain and forgetting I gathered up yarn, needles, notions and loaded a project bag.

Now to just cast on! Happy Knitting!!

A Question Of Leftovers

I finished my Jacoby mitts and posted yesterday. I only used 40 grams of yarn out of 100 total. That meant I have 60 grams of yummy yarn goodness leftover. I considered making another pair of gloves. But my brain wanted a change up. So I thought why not split the leftovers into two balls and knit two toe-up socks until I run out of yarn. I’m thinking my basic 68 stitch vanilla sock worked from the inside of the ball with afterthought heel worked from the outside of the ball. That way I can finish the heel and maximize my leftovers. And to make sure I’d get a start on this during Jellybean’s nap time I weighed and wound up the leftovers, pulled. the correct needles, and got everything including notions pulled into one project bag.

I have no excuse to start these ASAP right? What do you do with your leftovers?

A Growing Gru

 My husband’s Gru scarf is growing!

 

After some swatching I’ve settled on pattern ratio of black to grey. I think it’s pretty smart looking. I’ve been weaving in my ends as I go and I’ve grafted the cast on edge. This way I don’t have to fuss with the tube as it grows. I’ve taken this project in the car and to work so it can see some action before Halloween gets any closer!

P.S. My project bag for this project is a Halloween bag from dollar tree. I think it’s appropriate in this case 🙂

WIP Wednesday: Jacoby Mitts

 One mitt is in the books! This worked up crazy fast, which is good because I don’t have a lot of knitting time these days.

  

I love how something all scrunched up (below) can turn into loveliness (above). God bless ribbing!
  

I did do some mods like knitting an extra inch off the arm portion. I wanted something that would tuck up under my sleeves. The thumb opening is tight but not uncomfortable. Someone warned me about this so I was nervous. And I knit the hand portion until it covered my knuckles. I’m super happy! 

I even made sure to cast on the second mitt before this filtered to the bottom of my knitting bag. This yarn makes my heart go pitter patter so I doubt these take long to finish!

 

Happy Knitting!

What’s On My Needles #11

I’ve had some training seminars this week, aka lots of time in dark ballrooms and computer labs. So my Checkerboard Socks have seen some action. ( I’ve never knitted where it bothers other people or the instructor, only when it’s appropriate.

 

I’m past the heel waste yarn and almost to the ribbing/cuff. I have more training coming up so maybe these will join the FO pile soon! I’m totally digging the subtle variations in color. 

Happy Knitting!

All But The Spikes!

As hoped I managed to finish the hat portion! It’s looking a bit big even for growing boy. But jellybean is not in the mood to try this one so I’m not sure yet.  

 

 I even started one of the spikes!

 

I’m not sure if it’s my execution or the pattern but it looks a bit messy to me. I think I’m going to play around with the next couple of spikes to find what I like. The pattern I’m using is this one. I’d like a smoother edge so I’m going to slip the edge stitches to see what kind of holes/edge that makes.

Happy Knitting!

Mitts For Myself

I’m taking the warnings seriously that my new office will be frigid this winter. I had empty needles from my rainbow vanilla socks so I wanted to start some fingerless mitts to have as my “car” knitting.

I scanned my queue and came up with the Jacoby mitts from berroco.

  
Photo credit @ Berroco

I dug through my stash and found some Cloudlover sock yarn in blackberry truffle that I got as stash enhancement back during #sockswithsarah in January.

  
The yarn is dark and I’m glad these are gloves. I don’t think I could have managed full on socks with all that dark yarn and tiny stitches.

My husband laughed at me for starting gloves in July but when you have abbreviated knitting time, what’s a girl to do?

Happy Knitting!

A Dinosaur For Jellybean

I had to put this hat into time out after my Dino-Uh Oh a few weeks ago.

  
But I’ve picked it back up and it’s FLYING! During nap time and daddy time I was able to knit the brim correctly including the ear flaps this past weekend. And then I worked the hat to where I need to start the crown decreases.

  
I’m hoping to get the hat portion done this week. Maybe I can start the Dino spikes over the weekend? But with a wee one that might just be wishful thinking…

One thing I know for sure is that this hat will be warm and soft! Now I just need to teach him how to leave on our hat!

Happy Knitting! 

So Close Yet So Far!

My lunch-time knitting seems to be progressing at a glacial pace but really I know that I’m so close!

  
I’m past the heel lifeline and four stripes into the leg ribbing on my Maple Vanilla socks. My internal goal is to get one stripe worked in the ribbing each work day. I think I need 13 total so I should be able to knock that out. I just keep reminding myself that a few stitches here and there really do add up!

Happy knitting!!