I managed to squeeze in a third day’s worth of knitting over my Christmas vacation. On Day three I managed to finish the raglan, separate for sleeves and start the body with A-line shaping.

Given my post baby #2 enhanced waste line I opted for an a-line shape to provide better coverage for the back 40. I think at this point I have used two full balls of the grey yarn and starting the third. I have six total. And I haven’t slipped this one to check fit either.

Here is a gratuitous shot of car knitting in my new favorite pajama leggings. It was a bright and cold trip home from Christmas with snoozing dogs and babies in the back. A pretty darn good trip except for the PB had a blow out in her car seat in the last 5 min of the drive. I think she just wanted to give me a belated Christmas present, lol.
Happy Knitting!











I took a deep breath and told myself I was the boss of my knitting. I knew that this would bother me and I really needed to fix it. So I pulled out some fingering waste yarn and put in a lifeline where the work was correct. And then….I ripped out the needles and frogged.


