Memory Mojo Unlocked

My blanket mojo has fired up after the holiday haze has lifted. I have added NINE squares since last I showed this off last time.

I finished off an entire row and started a brand new one. This newest row is leftovers from my tiny sweaters and tiny socks from the 2021 Chromatic Yarns advent calendar. I still have a tiny nub of yarn leftover after I complete all three things. So those are going into my scrap stash.

I have 24 minis and 17 squares across, so when I hit the end of the row I will have to decide to go to another row or add an additional column. What do you think??

2021 Advents: Day 4

A lazy day still neglecting to take down all of the Christmas decorations has brought to you a new tiny sweater and two new tiny socks.

This was day four of the 2021 Chromatic Yarns advent calendar. It was a beautiful golden rod color. This D&D inspired color was called Yochlol. I have not a stinking clue what that means as I don’t follow that genre but I can appreciate beauty in all forms.

On to day five! Happy Knitting!!!

Boxing Day Bonus

I treated myself to a little yarn surprise as I really can’t 100% count on my family to sustain my yarn habit. This year my kids picked out beige towels and a bath mat. Perfectly lovely but not exactly crafy.

I snagged a skein of Chromatic yarns in Sturdy Sock called True Sight. Also a cute little puppy hand beaded stitch marker. Hannah also throws in a bag of bird and blend tea. This one was a fruit and custard herbal tea.

Zero clue what I will do with this yarn and so it will go into my Chromatic Yarns every growing stash. I feel like making another variegated shawl in this year. I have lots of blues and greens along this color scheme that would blend well. Maybe after I lose my mitred square blanket mojo?

Happy Knitting!!

2022 Christmas Eve Cast On

I knew that I would finish up my 2022 Cozy Knitter advent socks on Christmas Eve so I planned another cast on for my Christmas Eve project. This was a skein of Must Stash Yarn that I scored on a destash.

It’s called Bumbles Bounce and its one of her must match skeins. So that means it actually two perfectly aligned half skeins starting at the same point. They also matched my Christmas jammies very well.

As they are aligned correctly, I think I will work them very similar to my advent socks. I will work equal numbers of stripes on each sock so they progress in tandem. That way I have finished socks at the same time. It really was satisfying!

Did you cast on anything for Christmas or Christmas Eve?

FO Friday: 2022 Advent Socks

My 2022 Advent Socks are in the books!

Pattern: My own toe up vanilla sock recipe with 68 stitches

Yarn: Cozy Knitter Bliss Sock in the 2022 Advent color

Needles: US 1s

Mods: none

The toes and heels are made from Leading Man Fiber Arts Showstopper gradient in the ‘Baby It’s Cold Outside’. I decided not to use it for the cuff as I wouldn’t have had enough for both socks.

For the main self-striping, I only used one repeat of the 24 stripe sequence. So I have enough to make a whole other pair of socks! I think all combined these socks have 267 yards of yarn. They are just taller than ankle socks.

The one stripe per day was very addicting. I think I only had two or three days in the month where I was unable to make time to knit them. And in what felt like no time flat, I had a whole pair of socks fall off the needles! Ten out of ten, I will do this kind of advent again!

Happy Knitting and Happy New Year!!

What 45 Minutes Makes

We are back to the normal life grind after the holidays. I thought I would share what 45 minutes of gymnastics gets me. I am still working through my 2021 advent calendar minis from Hannah of Chromatic Yarns.

I had the neck of the sweater started when I sat down in the waiting room.

By the time we got home, I had the yolk done and sleeves on waste yarn. I just couldn’t quite the whole body done before I needed to pack up.

I need like three more rows of body, two rows of ribbing and then cast off. The body of the sweater will be complete. Also, you can see the havoc that dry air, hand washing and tiny sharp needles are wreaking on my finger tips. I’m trying to heal up with some intensive repair creams and it’s working okay-ish so far.

Happy Knitting!!

Christmas Heels

My 2022 advent socks now have heels!

I am still using the Leading Man Fiber Arts mini called “Baby it’s cold outside” color. I put in waste yarn between stripes where I wanted the heels so I only had to slide needles in and pick out the waste yarn. I think with the many different colors that the blue color works nicely!

We had some inclement weather with a work from home day, so I was able to install both heels last week during Teams calls. The socks did get finished on Christmas eve and I snapped some fire side photos to share later this week. I hope everyone has had a safe and happy weekend.

Happy Knitting!!

Ghosts of Advents Past (Part 2)

When I found my wee advent socks, I also found the mini sweaters I was making. I hated them…they were short sleeved and very tiny. So I ripped them out and figured out a long sleeve and larger version I liked.

They turned our great! I am still using Wee Sweater by Sarah Schira pattern, just with some mods. A wee sweater takes me a full evening of TV knitting. So I only have two of these complete but they are fun and get a little faster each time.

For these, I found some gold ribbon that I plan to “hang” the sweaters from for a sweater garland. This garland will be separate from the tiny sock one. One is good so two must be better!

Happy Knitting!!

Cozy Knitter Sock Advent Progress

I am catching up with the 2022 Cozy Knitter self striping 24 day advent skein!

This is roughly day 10 or so? I may not get a stripe every day but they are only 4/5 rows total so it’s easy to catch up. I am giving myself the grace to complete this as quickly or slowly as I need. After all, I have all of Christmas weekend to do whatever catch-up I need!

Happy Knitting!!

Ghosts Of Advents Past (Part 1)

With all the festivities this year, I decided to pull out my 2021 Chromatic Yarns advent calendar. I had this big plan last holiday to knit 24 tiny little socks. Yeah…..that never materialized, lol.

I’m feeling a little more grounded this year so I re-evaluated and decided that the socks should be pairs. I have managed to finish two pairs and almost done with a third. These are the first three advent days in order.

When they get done, I am thinking of stitching them to a ribbon decorative twine to make a garland. But let’s get over the hurdle of 48 total tiny socks. It takes me half an evening of knitting to make a sock if I can stay off my phone. So maybe a Q1 2023 goal?

Happy Knitting!!